|
|
TM 11-6130-429-12
4-11. MAINTENANCE INSTRUCTIONS Continued
REMARKS
LOCATION
ITEM
ACTION
FINAL INSPECTION
Final inspection insures that all main-
tenance functions contained in this
technical manual have been complied
with before the equipment is returned to
service.
PMCS-Assure that all requirements in
Converter should meet
Section Ill of this chapter have been
all requirements of this
accomplished.
section before operating,
Completeness-Inspect converter for
packaging, or storage.
completeness. Refer to Appendix B
for a list of components.
If the operational check,
Be sure all items listed in Basic
Issue Items List are on hand.
PMCS, or maintenance
Check to see that each item is
action cannot be performed
correctly stock numbered.
satisfactorily, contact
Be sure that the correct quantity
general support
is available.
maintenance.
PLACING IN SERVICE
Organizational maintenance personnel
will insure that the converter is in service-
able condition before turning the equip-
ment over to operating personnel.
4-13/4-14 (blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |