|
|
TM 11-6130-429-12
Section Il. OPERATION UNDER USUAL CONDITIONS
2-2. ASSEMBLY AND PREPARATION FOR USE
The converter is completely assembled and ready for use. Organizational maintenance personnel
will install the converters for operator's use.
NOTE
If blower is not operating and fault indicator lamp is lighted, notify or-
ganizational maintenance.
2-3. OPERATING PROCEDURE
TURN ON - Place ON/OFF switch to ON position.
FAULT indicator lamp goes out.
NOTE
If FAULT indicator remains lighted with ON/OFF switch in ON position, have
your supervisor check downstream to see if output is being used.
2-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |