Click here to make tpub.com your Home Page

Page Title: SERVICE UPON RECEIPT CHECKS AND INSPECTIONS - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6130-429-12
4-4. SERVICE UPON RECEIPT CHECKS AND INSPECTIONS - Continued
REMARKS
ACTION
ITEM
LOCATION
PERFORMANCE CHECK
Set to 10 Vdc scale.
1. Multi-
Function
meter
switch
OFF (applies to initial installation only).
2. Front
ON/OFF
panel
switch
Insert multimeter BLACK lead.
+5V RTN
+5V P1
Insert multimeter RED lead.
ON.
ON/OFF
switch
If voltage is between +4.5
Observe indication; should be
Range
3. Multi-
+5 volts 0.1 Vdc.
and +5.5 volts, no adjust-
meter
scale
ment is necessary.
If voltage is less than +4.5,
or more than +5.5 volts dc
perform ADJUSTMENT
procedures.
4. Front
OFF.
ON/OFF
panel
switch
+5V P1
Remove multimeter RED lead.
+ 5V P2
Insert multimeter RED lead.
ON.
ON/OFF
switch
Same remark as for step
5. Multi-
Range
Observe indication; should be
3 above.
meter
+5 volts 0.1 Vdc.
scale
OFF.
6. Front
ON/OFF
panel
switch
Remove multimeter leads from equipment.
Converter is now ready for operator's use.
CAUTION
DO NOT LET MULTIMETER LEADS HANG
TOO CLOSE TO BLOWER IF CONVERTER
IS OPERATING.
4-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business